Thursday, February 17, 2011

World Class's Newest Well in Fise











A stake marks a propitious site for drilling as determined
by the hydro geologist































Amanda Addo, World Class Ghana board member, oversees arrival of the drill rig
























The drill rig at work















Following the dusty drilling procedure, workers trim the pipe


















A worker lays out the area for the well housing which will surround the pipe


A mason works on the well housing, followed by an electrician































Preparing for installation of the electric pump


Installing the pump





















Residents fill a bucket with clean water from the temporary stand-pipe. Soon the plumber will connect the poly tank reservoir from which residents will draw water to the pump.